|
|
|
|
| Author | Topic: No longer critical |
| Kevin |
posted 6/23/07 12:35 AM
Now the rain has fallen and the dams are over 50% the rush to start this CRITICAL infrastructure has now passed.Lets have a proper EIS process to show the failures of desalination as a solution to Sydneys water problems.Some real solutions to the the long term water shortages are now available and we could have 1.9 billion dollars to get them right. |
|
|