Return To Message Board
Author Topic:   No longer critical
Kevin posted 6/23/07 12:35 AM    
Now the rain has fallen and the dams are over 50% the rush to start this CRITICAL infrastructure has now passed.Lets have a proper EIS process to show the failures of desalination as a solution to Sydneys water problems.Some real solutions to the the long term water shortages are now available and we could have 1.9 billion dollars to get them right.
Return To Message Board

Back To My Home Page  | Post New Topic